J'ai passé un entretien chez Cadence Design Systems (Austin, TX)
Entretien
Virtual interview with the hiring manager on Microsoft teams. it was a 60 min interview. We discussed basics of CMOS, power consumption within the circuit, contributors to the power consumption etc.
Questions d'entretien [1]
Question 1
Explain the inverter working and power consumption for that circuit
J'ai postulé en ligne. Le processus a pris 4 semaines. J'ai passé un entretien chez Cadence Design Systems (San Jose, CA) en janv. 2017
Entretien
Got an email from HR to schedule an interview with Hiring manager. Phone Interview with the hiring manager went very well. Asked detailed information about my background and Internship experience. No technical questions were asked. Onsite interview was scheduled after a month. It was for about 2 hours with 2 different interviewers. Interviewers asked me questions related to resume, background and experience.
J'ai postulé via un recruteur. Le processus a pris 3 semaines. J'ai passé un entretien chez Cadence Design Systems (Cary, NC) en juin 2015
Entretien
Sent resume to a recruiter through Linkedin. He forwarded to the hiring manager immediately.
1 phone round with the director followed by an on-site interview the same week since it was an immediate opening.
Questions d'entretien [1]
Question 1
Describe the entire Placeand Route flow with all the steps.